Production lines for facade elements
Architectural facade elements for the new hospital of Kortrijk: both first and second phases
All the elements consist of a base beam, 4 vertical parallelogram-shaped columns and a top beam
Production sequence:
- Separate pour of the 1st phase of the base beam
- Inverted casting of the base beam
- Turning and moving precast base beam to column cast position
- Separate pour of the top beam
- Pouring columns onto precast base beam
- Placing precast top beam on column forms
- Casting top beam on the columns
In this way, all the components are cast separately with a high-grade finish and the diagonal tolerance of ±2mm is achieved, and above all the separate precast elements form a monolithic unit.